December, 2000

before cupola     installing cupola     roof     new church

November, 2000

wall inside     wall outside     framing concrete floor     concrete floor fininshing     erecting gathering space     gathering space    

July, 2000

installing_drainage     columns_arrive_by_f_kells     installing_columns     pouring_concrete     columns_in_place    

Easter 2000

Jul, 2000 Easter    

April, 2000

apr, 2000 excavation     apr, 2000  foundation     apr, 2000 foundation

Jan 12, 2000

jan 12, 2000 martn lot.jpg (97292 bytes)     jan 12, 2000 trucks.jpg (88076 bytes)     jan 12, 2000 excavation.jpg (88076 bytes)

Jan 4, 2000

jan 4, 2000 excavation behind church.jpg (177164 bytes)     jan 4, 2000 excavation.jpg (180236 bytes)     jan 4, 2000 looking east from north parking lot.jpg (242407 bytes)

Ground Breaking, Nov 21, 1999

nov 21, 1999 ground breaking.jpg (161974 bytes)     nov 21, 1999 al huba parish founder.jpg (139991 bytes)

Nov 1999 Before Construction

nov 1999 martin lot.jpg (153677 bytes)     nov 1999 looking east from north parking lot.jpg (155661 bytes)     nov 1999 hill behind rectory.jpg (111309 bytes)

Elevations & Floor plans     (Click on pictures to view full size.)

north elevation.jpg (54557 bytes)     cross section thru worship space.jpg (377868 bytes)

floor plan.jpg(98409 bytes)     baptismal area.jpg (432140 bytes)